Skip to content

    Create an instrument

    Start an instrument empty, from a copy or with the AI workshop, edit its structure, save versions and outlines, and delete one you no longer need.

    Make your own instrument when no built-in one fits your method, or copy one and change the copy. You need to be someone who builds surveys in the workspace. Built-in instruments cannot be edited.

    Start a new instrument

    1. Open New instrument

      Go to Surveys > Instruments and select New instrument.

    2. Describe it

      Give it a Name and an optional Description. Choose its Type: Before/after, asked before and after an event so the two answers are compared, or Single, asked once. The type cannot change later. Pick a Category and a Policy.

    3. Choose how it starts

      Start empty gives you one empty section. Start from a copy copies any instrument you can see. Describe it and let the AI draft it opens the AI workshop, described below.

    4. Create it

      Select Create and edit, or Create from the copy when you start from a copy. The editor opens on your new instrument.

    To copy an existing instrument without starting from this screen, open it and select Copy to my workspace. A copy of a Strict instrument is Guided.

    Edit the structure

    On your instrument's page, select Edit structure.

    Part of the editorWhat you set
    AI promptsThe framing for Both rounds, the Before round and the After round
    LimitsThe Category studies are filed under, Event types, Suggested audiences, the Measure, and whether The round framing is fixed. Only a Strict instrument enforces them
    SectionsAdd a section, then its title, description, when it is Asked, its before and after Scale, and a one-line note on how the rounds word it. Drag the grip or use the arrows to reorder
    ItemsAdd a topic or Add a question. For a topic, how many Questions it becomes. For each item, its Scale, its After round mode, and the rules Allow "Not applicable", Same shape and Word for word
    Open questionAdd an open question to a section, asked in the same rounds as the section

    What a respondent sees previews each item as it will appear. Before you save, the editor lists anything that stops the save, in sentences such as "Section 2 is asked after but has no after scale. Pick one, or give each topic its own."

    If you leave with unsaved changes, the editor asks first.

    Save versions

    • Save a new version saves your changes as the next version of this outline. Add a note under What changed if you like.
    • Save as a new outline keeps your changes as a second outline beside the current one, under a name you choose. On the instrument page, Make this the default outline decides which outline studies use.
    • Versions lists every saved version. Restore this version makes an old version the newest one; the versions in between stay in the list.

    Only the people who manage an instrument can save or restore its versions. Everyone else can read them.

    Draft it with AI

    The AI workshop writes a complete first version from a short brief, which you then refine.

    1. Fill in the Subject, which is required, and if you like the Purpose, the Audience, What it measures (Perceived gains, Same question twice or Knowledge check), the Event types, the Language (English or French) and the Sections wanted. You can also Start from an existing instrument; the original is not changed.
    2. Select Draft with AI. The draft usually takes under a minute.
    3. Refine it with Ask for a change, one AI pass per change, or edit it by hand. Hand edits are saved to the draft as you go. Turn on Keep this section as it is to protect a section from later changes. Word-for-word items are put back after every pass.
    4. Select Save as instrument, with its policy, category and description. Discard deletes the draft.

    Each draft has a set number of AI passes, shown as "used of" a total. An open draft closes after 7 days. The workshop uses your workspace's monthly AI budget; see AI usage.

    Delete an instrument

    Delete removes the instrument, its outlines and their versions for everyone in the workspace. It cannot be undone. An instrument that studies were built from cannot be deleted, and an instrument with per-unit versions needs those versions deleted first. You can still rename or copy it.

    For versions made per unit by a hierarchy run, see Across units.

    Was this helpful?