Across units
Run one instrument across a whole hierarchy in one action with Generate for my hierarchy: what you choose, what is adapted per unit, approval before sending, and following the run.
Generate for my hierarchy takes one instrument and gives every unit you pick its own study, or its own version of the instrument, in one action. At Westbridge, the Dean of Science sets up the autumn study for every Science class at once.
Available on Organization and Enterprise
You need an Organization workspace, and to manage the whole organization or at least one unit. Open an instrument in Surveys > Instruments and select Generate for my hierarchy. You can pick only units you manage and the units below them. Studies need a before/after instrument and a plan that includes before/after studies; otherwise the run makes instrument versions only. A quiz instrument cannot make studies this way either, so choose Instrument versions only for it.
What you choose
| Choice | What happens |
|---|---|
| Same survey for every unit | Every unit gets the instrument as it is. No AI call, nothing reworded. Every unit answers identical questions. With Send when ready, this is one study that goes to all the picked units |
| Adapted survey per unit | For each unit, the AI rewords the instrument and a draft study is built from that version |
| Also add the versions to my instrument library | With an adapted survey, each unit's version is also kept in the library, under its parent instrument |
| Instrument versions only | A version per unit in your library, and no studies |
Then set:
- Units: tick them in the tree, or use All, Bottom level, None and All below. A unit can be in only one run of an instrument at a time.
- Instructions for the AI (optional): for adapted surveys, such as "use the unit's own words, keep questions under 15 words".
- Sending: Send when ready or Each unit approves, explained below.
- Dates: Before opens, Before closes, After opens and After closes, set once for the whole run. They start filled in: the before round opens next Monday and lasts a week, and the after round follows for a week. A manager who approves a unit's survey can change its dates.
- Answers: Named, or Anonymous within the organization, as for any study.
Before you select Start, an estimate shows the number of units, the draft studies it will make, and its share of this month's AI budget. If your plan does not have room for every unit's before and after, the panel says how many units fit.
What is adapted per unit
The AI rewords the instrument for each unit from the unit's name, its description, its place in the tree and your instructions. Structure, scales, locks and policy stay as they are. Word-for-word items are never sent to the AI.
| Item in the instrument | Its rule | In BIO 101, Cell Biology | In CHEM 110, General Chemistry |
|---|---|---|---|
| "Ability to connect abstract theories to concrete, real-world examples" | Worded for the subject | About cell theory and real cases | About bonding, reactions and real cases |
| "Problem-solving and analytical reasoning within this field" | Word for word | Unchanged | Unchanged |
The AI makes one call per unit, with at most two tries, and the run stops if the AI budget runs out.
Approval before sending
- Each unit approves is always used for adapted surveys. Each unit's manager reviews its survey and selects Approve and send. Nothing reaches people before that.
- Send when ready is offered only with the same survey for every unit. The survey opens on its dates as soon as it is built, and everyone in the picked units is told by email.
Managers find their queue under Waiting for your approval, from a card on the dashboard overview. Each survey shows What changed for this unit against the instrument's wording, and Edit questions opens the draft. Don't send keeps it as a draft that can be sent later from the run. Several surveys can be ticked and sent together.
Following the run
The instrument's page lists its Runs for units. Open run shows two tabs.
Units. The tree as a table, with each unit's status (Building, Waiting for approval, Scheduled, Open, Closed, Not sent, Failed, Made), who approved it, when it opens, and how many people answered before and after. Totals read "12 of 14 sent", and you can show All, Needs attention, Open or Closed. While units wait for approval, Remind them reminds their managers, at most once a day.
Results. One table from the whole run down to each unit, with Matched, Before, After and Change, for Overall or one measure at a time.
- A row combines the units under it when they were asked comparable questions: the same survey in every unit, or a Strict instrument. Otherwise the page says "These units were asked different wordings, so rows are not combined."
- A parent row pools the people below it. It is not an average of the unit averages, so a large department weighs more than a small one.
- Questions asked as gains show the reported gain under After, with no change, since a gain has no before to subtract.
- A unit with too few people shows "Too few people to show" instead of figures.
- Export CSV downloads the table.
A unit's name opens its own study. See Reading a study.
Was this helpful?
Suggested articles
- InstrumentsWhat an instrument is, why it is kept apart from a survey, what it contains, its three levels of freedom, and where instruments and their versions live.
- Built-in instrumentsThe four instruments every workspace starts with: Learning gains, SALG, the SALG baseline and CTL Pedagogical Triangulation. What each measures and when to use it.